conversion

EPISODE 5 - Removing the Floor

We finally got the floors pulled up! School bus floors are covered in a rubber that is glued onto plywood. The plywood is nailed down to a metal base layer and is much harder to get out. But once removed, and all the metal floor is exposed as it is easy to treat any holes or rust.

EPISODE 5 - Removing the Floor

EPISODE 2 - Air Conditioning

It was a hard decision to pull out the air conditioning system. The bus came with a Carrier split air conditioning system. It’s comprised of two compressors connected to the engine that drives the R124 Freon towards two giant skirt condensers under the bus. It then runs up into three evaporators inside the bus. 

EPISODE 2 - Air Conditioning